Skip to content
Started 1 yr 7 mo ago
Took 7 min 43 sec
Success

Build #1 (Sep 29, 2022, 9:18:21 AM)

Push event to branch 2.1.1-BRANCH at 9:18:08 AM on Sep 29, 2022

This run spent:

  • 5.8 sec waiting;
  • 7 min 43 sec build duration;
  • 7 min 49 sec total from scheduled to completion.
Revision: 997c47181a21d6df7ea2de9fa3bae2cd581e3c02
Repository: https://github.com/eclipse-ee4j/tyrus.git
  • 2.1.1-BRANCH