Skip to content
Started 23 hr ago
Took 2 hr 10 min

Build #725 (Apr 30, 2024, 9:10:32 PM)

Changes
  1. releng: Add e4.32 and update eStaging targets for 2024-06 M2 (details)

Started by upstream project tracecompass-master-sonar-base build number 252
originally caused by:

This run spent:

  • 27 sec waiting;
  • 2 hr 10 min build duration;
  • 2 hr 10 min total from scheduled to completion.
Revision: bb161aba7c453247151a24da1154ce9c4128dc2e
Repository: https://github.com/eclipse-tracecompass/tracecompass-infra.git
  • refs/remotes/origin/master
Revision: 721ebe4b5de1564a0c25b61606c9e77430017bfa
Repository: $GERRIT_REPOSITORY_URL
  • master