Skip to content
Started 1 yr 2 mo ago
Took 1 hr 16 min
Success

Build #174 (Mar 9, 2023, 4:12:00 AM)

Changes
  1. releng: Update e4.27 and eStaging targets for 2023-03 RC2 (details)

Started by timer

This run spent:

  • 4 ms waiting;
  • 1 hr 16 min build duration;
  • 1 hr 16 min total from scheduled to completion.
Revision: 3e1ed443656795e38ee477ae52bcdd42a6b7d3ea
Repository: https://git.eclipse.org/r/tracecompass/tracecompass-infra
  • refs/remotes/origin/master
Revision: 6e7240babbec70f49e5e3e863948db105f069ce2
Repository: $GERRIT_REPOSITORY_URL
  • stable-8.3
Test Result (no failures)