Skip to content
Started 6 mo 9 days ago
Took 1 hr 6 min

Build #656 (Oct 25, 2023, 7:36:45 PM)

Changes
  1. releng: Update e4.30 and eStaging targets for 2023-12 M2 (details)

Started by upstream project tracecompass-master-nightly build number 745
originally caused by:

This run spent:

  • 24 sec waiting;
  • 1 hr 6 min build duration;
  • 1 hr 6 min total from scheduled to completion.
Revision: 06cb45711296be00d1d7a33b25e3b6d410e652b7
Repository: https://git.eclipse.org/r/tracecompass/tracecompass-infra
  • refs/remotes/origin/master
Revision: 0271b2d624aa37e6c68d0ae3d689f43321a3891d
Repository: $GERRIT_REPOSITORY_URL
  • master
Test Result (no failures)