Skip to content
Started 1 yr 3 mo ago
Took 1 min 52 sec

Build #124 (Feb 2, 2023, 3:20:28 PM)

Changes
  1. Change SIMREL_REPO back to staging (details)
  2. Synchronize releasing.md (details)
  3. [releng] Prepare repo for 2023-03 M2 (details)
  4. Bug 581357: Correct splash screen for 2023-03 (details)
  5. Set version qualifiers with setGitDate script (details)

Started by user Jonah Graham

This run spent:

  • 29 sec waiting;
  • 1 min 52 sec build duration;
  • 1 min 52 sec total from scheduled to completion.
Revision: b9a0c3067e6f0299b1118ef641b693ec89953914
Repository: https://git.eclipse.org/r/epp/org.eclipse.epp.packages
  • refs/remotes/origin/master