Skip to content
Started 2 yr 6 mo ago
Took 1 min 2 sec on basic-22vc6

#3 (Nov 8, 2021, 4:37:10 AM)

Changes
  1. Remove the combined POM as it is no longer used. (details / githubweb)

Started by upstream project expression-language-master build number 89
originally caused by:

This run spent:

  • 26 sec waiting;
  • 1 min 2 sec build duration;
  • 1 min 29 sec total from scheduled to completion.
Revision: 41a4d15d782db4d5895c1096184c188c0cf318d0
Repository: https://github.com/eclipse-ee4j/el-ri
  • refs/remotes/origin/master